https://www.patsnap.com/resources/blog/rd-blog/integral-pressurized-water-smr-design-patent-landscape/ · Patsnap · data cut-off 2026-07-31 · downloaded from the live page
Patent Landscape · Small Modular Reactors
Integral Pressurized Water SMR Design Patents: Who Holds the Core Claims
  • 77.9% of all 77 records sit with just five assignees, while the remaining eighteen ranked filers split the rest — a concentrated field with a long tail.
  • Marine and naval deployment shows up in over a quarter of records (B63B, 27.3%), pointing to offshore and shipyard-delivered reactor platforms as a distinct filing cluster, not a footnote.
  • Filings peaked in 2022 at 12 and have tapered since, though the 2025-2026 count is understated by the usual publication lag.
Get a prior-art report on your approach
77
Published Records
78%
Top-5 Share of All Records
US
Leading Jurisdiction
23
Active Filers Ranked

Top-5 share is the combined record count of the five largest assignees divided by all 77 records in scope (CR5), not by the ranked leaders only.

Published byPatsnap Research··6 min readSourced from Patsnap Eureka
Field Overview

What this landscape covers

This review covers 77 published patent families filed between 2015 and 2026 that combine integral or modular pressurized-water reactor architecture with at least one of natural circulation cores, integrated steam generators, containment sizing, load-following operation, factory fabrication, or seismic isolation. The scope is deliberately narrow: it is not all SMR patenting, but the subset where reactor design claims meet a specific engineering constraint that shapes how a unit is built, sited or licensed. Publication lag of roughly eighteen months means the last one to two years of filings are undercounted in any trend line drawn from this data.

Patent families, not raw document counts, are the unit used throughout this review, which limits the distortion that comes from continuation practice and multi-jurisdiction refiling of the same invention.

Filing activity, 2017-2026
  1. 1ADVANCED REACTOR CONCEPTS LLC17
  2. 2ENERGIE PROPRE PRODIGY LTEE PRODIGY CLEAN ENERGY LTD16
  3. 3GLOBAL ENERGY RESEARCH ASSOCIATES LLC14
  4. 4STRONG FORCE IOT PORTFOLIO 2016 LLC7
  5. 5BLUE ENERGY GLOBAL INC6
  6. 6TROJER MATHIAS6
  7. 7UNIV OF MARYLAND3
  8. 8OHIO STATE INNOVATION FOUND3
  9. 9VIRGINIA TECH INTELLECTUAL PROPERTIES INC3
  10. 10JACKSONVILLE UNIVERSITY2
Source: Patsnap Eureka. Assignee ranking and totals. Derived from a Patsnap search on Integral Pressurized Water SMR Design covering 2015–2026, data cut-off 2026-07-31. Counts reflect published records only and shift as new filings publish.Run this in Eureka MCP

Let an AI agent run this analysis on your own technology

Pick a task. Every answer cites the patents behind it.

10,000 free credits to start
The Numbers

Filing trend and technology composition

Two views of the same 77 records: how filing activity has moved year over year, and which IPC subclasses the claims actually sit in.

From first wave to plateau

Annual filings ran from 11 in 2017 to a peak of 12 in 2022, then declined toward 1 in 2026 — a partial year that will fill in as later publications clear the pipeline. Read the recent downturn cautiously rather than as a settled retreat from the space.

From first wave to plateau036912112017201820192020202112202220232024202512026Most recent year is partial — publication lag means later filings are not yet visible.

Reactor and plant classes dominate, marine classes cluster distinctly

G21D (nuclear power plants) and G21C (nuclear reactors) cover 61.0% and 53.2% of the 77 records respectively, which is expected given the search scope. The more informative signal is B63B (ships and marine vessels) at 27.3%, alongside smaller but consistent counts in E02D, E04H, B63G, F02B and E02B — foundations, specialised structures and engine classes that trace the siting and deployment problem rather than the core physics.

Reactor and plant classes dominate, marine classes cluster distinctlyG21D · Nuclear power plants4761.0%G21C · Nuclear reactors4153.2%B63B · Ships & marine vessels2127.3%E02D · Foundations & earth drilling79.1%E04H · Specialised buildings & struct…79.1%B63G · Naval vessels & offensive67.8%F02B · Internal-combustion engines67.8%E02B · Hydraulic & waterway engineeri…56.5%Other3444.2%

Shares are the percentage of the 77 records in scope. A patent can carry several IPC classes, so the shares add up to more than 100%.

Source: Patsnap Eureka. Filing trend and technology composition. Derived from a Patsnap search on Integral Pressurized Water SMR Design covering 2015–2026, data cut-off 2026-07-31. Counts reflect published records only and shift as new filings publish.

Go deeper on Integral Pressurized Water SMR Design with Eureka

This page is one run against one query. Ask Eureka your own question about integral pressurized water smr design and every answer comes back with the patent numbers behind it.

Try Eureka
Representative Filing

A closer look at one record

Representative Record · US20210180284A1
US20210180284A12021-06-17

Systems and methods for periodic material-based seismic isolation for underground structures

UNIVERSITY OF HOUSTON SYSTEM

A seismic isolation system for underground structures comprises a periodic foundation and periodic arrays of piles in the soil or periodic piles that surround the underground structure. The periodic piles can substantially reduce incoming seismic waves from the lateral direction, and the combination of periodic foundation and periodic piles can result in total isolation for the underground structure — of particular interest for underground nuclear power plants and structures with basements.Filed by University of Houston System, published 2021-06-17.

US20210180284A1 — patent drawing 1US20210180284A1 — patent drawing 2
View full record
Most-cited records in this landscape
#Publication no.Patent titleCitations
1US20210098143A1Offshore and marine vessel-based nuclear reactor configuration, deployment and operation80
2US20110206173A1Small, fast neutron spectrum nuclear power plant with a long refueling interval41
3US20210082591A1Network and information systems and methods for shipyard manufactured and ocean delivered nuclear platform18
4WO2018107170A1Small modular reactor power plant with load following and cogeneration capabilities and methods of using13
5US20150052886A1Nanofuel engine apparatus and nanofuel13
6US20190206580A1Small modular reactor power plant with load following and cogeneration capabilities and methods of using8
7US20140321590A1Small, fast neutron spectrum nuclear power plant with a long refueling interval8
8US20220281568A1Marine power structure and coastal nuclear power station therefor7
9WO2018175663A2Systems and methods for shipyard manufactured and ocean delivered nuclear platform7
10US20200027575A1Small, fast neutron spectrum nuclear power plant with a long refueling interval6

Ranked by citation count within the searched corpus; older filings accumulate citations simply by being available longer, so treat this as a signal of influence rather than of current importance.

Each row carries its publication number; clicking a row searches Eureka by that number.

Source: Patsnap Eureka. Citation counts and representative records. Derived from a Patsnap search on Integral Pressurized Water SMR Design covering 2015–2026, data cut-off 2026-07-31. Counts reflect published records only and shift as new filings publish.Run this in Eureka MCP
Run it yourself

Put your own technology through the same analysis


  
Where to run it
Fastest

Eureka on the web

When you want the answer in the next five minutes.

The agent works the prompt against patents and technical literature, citing every source.

Run your analysis now →
For builders

MCP server & REST API

When it has to run inside your own pipeline.

Patent search, landscape analysis and assignee resolution as MCP tools. Drop them into any agent framework, or call REST directly.

Browse MCP servers →
Signals

What the data indicates

Three readings of the same 77-record set, each pointing at a different decision a filer or licensor needs to make.

Concentration
77.9% / 5 assignees
share of all 77 records

The top of the field is narrow

Five assignees hold 60 of the 77 records in scope. The ranked list runs to 23 companies total, so most of the field is a long tail of single- or few-filing entrants rather than a broad competitive middle.

Top 10 combined account for all 77 records (100.0%).
Deployment mode
27.3% B63B
of 77 records

Marine deployment is a real filing cluster

Over a quarter of records carry a ships-and-marine-vessels classification alongside reactor classes, plus smaller counts in naval vessel and hydraulic engineering classes. This points to offshore and shipyard-delivered platforms as a distinct design track rather than an edge case.

B63B 27.3%, B63G 7.8%, E02B 6.5% of 77 records.
Momentum
12 filings in 2022
peak year

Activity has cooled since the 2022 peak

Filings ran from 11 in 2017 to a peak of 12 in 2022, then declined toward the present. Recent-year assignee momentum is thin across the board, with most tracked leaders showing zero filings in the latest year — consistent with publication lag rather than a clear exit.

2017: 11 → 2022: 12 (peak) → 2026: 1 (partial year).
Eureka AI Agent
Looking for what nobody has claimed yet?

Eureka can read the same corpus for gaps instead of for coverage: under-claimed branches adjacent to integral pressurized water smr design, with the prior art for and against each one.

Find the white space →
Source: Patsnap Eureka. Co-assignee relationships and derived observations. Derived from a Patsnap search on Integral Pressurized Water SMR Design covering 2015–2026, data cut-off 2026-07-31. Counts reflect published records only and shift as new filings publish.Run this in Eureka MCP
Competitive Set

Who is filing, and where the ground is open

The ranked leaders sit alongside a handful of universities and single inventors, with co-assignee activity mostly linking one clean-energy developer to its named inventor and two academic pairs working the same seismic and structural angle.

Leader
17 records
of 77 in scope

A single filer well ahead of the field

The top-ranked assignee holds 17 of the 77 records, more than double the fifth-place count of 6. That gap is the clearest concentration signal in the dataset.

Leader: 17 · Fifth place: 6 · Tenth place: 2.
Co-filing
10 pairs
co-assignee pairs identified

Most collaboration is developer-inventor, not developer-developer

The strongest co-assignee link pairs a clean-energy SMR developer with a named individual inventor across 6 shared records. Two university pairs each co-file 3 records, both centred on structural and seismic work.

Strongest pair: 6 shared records.
Academic presence
3 universities ranked
in the 23-company list

University filings cluster on structure, not core physics

The academic entrants in this ranking file on foundations, seismic isolation and specialised structures rather than reactor internals — a narrower but less contested slice of the landscape.

Represented in E02D and E04H classes among others.
🔍
Under-claimed sub-areas worth watching
Branches with low but present filing density inside this dataset, suggesting room for a well-drafted first claim.
Periodic-pile seismic isolation for underground containmentLoad-following cogeneration control schemesShipyard-to-site delivery and information systemsMarine-vessel-integrated reactor hullsCombined foundation-and-pile isolation systems
Rank all filers by momentum →
Recent-year filing momentum by assignee
AssigneeRecent yearYoY
ENERGIE PROPRE PRODIGY LTEE PRODIGY CLEAN ENERGY LTD1—
Advanced Reactor Concepts LLC0—
GLOBAL ENERGY RESEARCH ASSOCIATES LLC0—
TROJER MATHIAS0—
BLUE ENERGY GLOBAL INC0—
ZORA ENERGY SYST LLC0—
University of Maryland0—
Strong Force IoT Portfolio 2016 LLC0—
Source: Patsnap Eureka. Assignee-level momentum. Derived from a Patsnap search on Integral Pressurized Water SMR Design covering 2015–2026, data cut-off 2026-07-31. Counts reflect published records only and shift as new filings publish.Run this in Eureka MCP
Next Steps

Where to take this next

This landscape frames the filing pattern; the next steps depend on whether you are clearing a design or scouting a gap.

Check freedom-to-operate against the leader's claim set

With one assignee holding 17 of 77 records, any integral PWR design work should start by mapping claims against that portfolio specifically, not the field average.

Explore assignee claims in Eureka

Watch the marine deployment cluster

B63B classification appears in over a quarter of records — a track worth monitoring separately from core reactor physics filings.

Track marine SMR filings in Eureka

Revisit the trend once 2025-2026 data matures

Publication lag means the apparent slowdown after 2022 is not yet a reliable signal; a re-check in twelve to eighteen months will sharpen the picture.

Set a monitoring alert in Eureka
Source: Patsnap Eureka. Forward-looking reading of the same dataset. Derived from a Patsnap search on Integral Pressurized Water SMR Design covering 2015–2026, data cut-off 2026-07-31. Counts reflect published records only and shift as new filings publish.Run this in Eureka MCP
FAQ

Common questions on this landscape

Answers are grounded in the same dataset. Derived from a Patsnap search on Integral Pressurized Water SMR Design covering 2015–2026, data cut-off 2026-07-31. Counts reflect published records only and shift as new filings publish.Run this in Eureka MCP

Research Integral Pressurized Water SMR Design in depth with Eureka

Go past this page: query the whole integral pressurized water smr design corpus yourself, in your own scope.
Every answer comes back with patent numbers you can open.

Try Eureka

Disclaimer. This page is generated from Patsnap Eureka data drawn from a limited snapshot of global patent and scientific-literature records, and is provided for general information and reference only.

Patent data carries inherent limitations: recent filings (typically the most recent 18–24 months) are under-counted due to standard publication lag; counts may be reported at either a patent-family or a patent-record basis and are not always directly comparable; classification, applicant-name, and citation data may contain errors, duplicates, or omissions; and the underlying search query defines and constrains the scope shown. As a result, the analysis may be incomplete or inaccurate and may not reflect the full technology landscape.

Nothing on this page constitutes an exhaustive prior-art, novelty, freedom-to-operate, or validity search, nor does it constitute legal, financial, investment, or professional advice, and it should not be relied upon as such. Any patent, commercial, or strategic decision should be verified independently and reviewed with qualified patent, legal, and domain professionals. Patsnap makes no warranties, express or implied, as to the accuracy, completeness, or fitness for any particular purpose of the information presented.

Machine translation. Assignee and organisation names originally recorded in Chinese, Japanese or Korean have been rendered into English by an AI translation step so that the tables stay readable. These renderings are best-effort and may not match a company's registered English name; the original name is what the underlying patent record carries, and it is what any Eureka query launched from this page uses.

Help us improve

Something wrong, out of date, or missing on this page? Tell us and it goes straight to the team that maintains it.