Virtual Power Plant EV Charging Infrastructure Patent Landscape 2026

Virtual Power Plant EV Charging Infrastructure Patent Landscape 2026
https://www.patsnap.com/resources/blog/rd-blog/virtual-power-plant-ev-charging-infrastructure-patent-landscape/ · Patsnap · data cut-off 2026-07-31 · downloaded from the live page
Patent Landscape · Smart Grid & Energy Systems
Virtual Power Plant EV Charging Infrastructure Patent Landscape 2026
  • Ten families, no runaway leader. the strongest co-assignee pair files together just once, so no single group has locked up this claim space yet.
  • China accounts for five of the nine identified receiving offices. filings from the US, EPO, HK and WIPO trail well behind, marking where enforcement geography is currently thin.
  • 2024 is the peak year so far at four filings, but the 2022 midpoint of three shows growth has been flat rather than accelerating into that peak.
Get a prior-art report on your approach
10
Published Records
CN
Leading Jurisdiction
7
Active Filers Ranked
2024
Peak Filing Year
Published byPatsnap Research··8 min readSourced from Patsnap Eureka
Overview

What this landscape covers

This dataset tracks patent families at the intersection of virtual power plant (VPP) orchestration and EV charging control — filings that combine aggregated distributed energy management with bidirectional or load-managed charging, classified under B60L53/60, H02J7 and H02J3/32. It is a narrow, still-forming corner of smart grid IP: ten published families across the full 2015–2026 window, most of them recent.

Because publication lags filing by roughly 18 months, the 2025–2026 count understates real filing activity; treat the most recent year as a floor, not a ceiling. The picture that follows is therefore about structure — who is filing, where, and against which IPC classes — rather than a finished market map.

Filing activity and IPC composition, 2015–2026
  1. 1Shanghai Cancong Robot Technology Co., Ltd.3
  2. 2Newway Co., Ltd.2
  3. 3ELISA OYJ2
  4. 4Hubei Hanwei Electric Power Consulting Co., Ltd.1
  5. 5Shenyang Northern Huamao Construction Technology Engineering Co., Ltd.1
  6. 6Huamao (Liaoning Shenfu New District) Construction Technology Co., Ltd.1
  7. 7Shanghai Shenghao Equipment Installation Co., Ltd.1
Source: Patsnap Eureka. Assignee ranking and totals. Derived from a Patsnap search on Virtual Power Plant EV Charging Infrastructure covering 2015–2026, data cut-off 2026-07-31. Counts reflect published records only and shift as new filings publish.Run this in Eureka MCP
The data

Filing trend and technology composition

Two views of the same ten families: when they were filed, and which control-systems classes they touch.

A flat, low-volume trend with one recent peak

Filings sit at zero in 2017, build unevenly through the low single digits, reach a midpoint of three in 2022, and peak so far at four in 2024. There is no compounding growth curve here — this reads as a field with sporadic entrants rather than an established filing cadence, and the most recent years are still filling in as publications catch up.

A flat, low-volume trend with one recent peak012340201720182019202020212022202342024202502026Most recent year is partial — publication lag means later filings are not yet visible.

H02J dominates; B60L is present but secondary

Every one of the ten records touches H02J (power supply and grid systems), confirming this is fundamentally a grid-control dataset that happens to interface with EV charging — only five records also carry a B60L (EV propulsion) code. G06Q and G05B appear in a minority of filings, suggesting that commerce-layer aggregation logic and closed-loop control are still secondary claim elements rather than the primary invention in most filings.

H02J dominates; B60L is present but secondaryH02J · Power supply & grid systems10100.0%B60L · Electric vehicle propulsion550.0%G06Q · Business, commerce & admin dat…330.0%G05B · Control & regulating systems220.0%

Shares are the percentage of the 10 records in scope. A patent can carry several IPC classes, so the shares add up to more than 100%.

Source: Patsnap Eureka. Filing trend and technology composition. Derived from a Patsnap search on Virtual Power Plant EV Charging Infrastructure covering 2015–2026, data cut-off 2026-07-31. Counts reflect published records only and shift as new filings publish.

Go deeper on Virtual Power Plant EV Charging Infrastructure with Eureka

This page is one run against one query. Ask Eureka your own question about virtual power plant ev charging infrastructure and every answer comes back with the patent numbers behind it.

Try Eureka
Key patents

Most-cited records and a representative filing

Representative filing
WO2024227976A12024-11-07

WO2024227976A1 — Computer-implemented method for managing a plurality of assets of a virtual power plant

ELISA OYJ

According to an embodiment, a computer-implemented method for managing a plurality of assets of a virtual power plant, wherein each asset in the plurality of assets comprises at least one battery unit, comprises: assigning the plurality of assets into a plurality of groups, wherein the plurality of groups comprises at least a reserve group and at least one active group and each asset in the plurality of assets is assigned to one group in the plurality of groups; in response to receiving an activation signal for power grid frequency balancing, offering assets for the power grid frequency balancing from groups in the plurality of groups other than the reserve group; and in response to detecting…Filed by ELISA OYJ, published 2024-11-07 — one of the few non-Chinese, non-US filings in this dataset, and the only WIPO/PCT record identified.

WO2024227976A1 — patent drawing 1WO2024227976A1 — patent drawing 2
View full filing
Highest-citation records in the corpus
#Publication no.Patent titleCitations
1CN115333159A一种民用建筑同层停车位“谷储直柔”虚拟电厂6
2US11747781B1Intelligent local energy management system at local mixed power generating sites for providing grid services5
3CN117400774A移动能源网络系统4
4CN117022026A电能充储一体化系统4
5US20230297047A1Intelligent local energy management system at local mixed power generating sites for providing grid services4
6CN121642969A一种基于V2G聚合的配电网双向潮流协调控制方法3

Citation counts inside this corpus favour older filings simply because they have had longer to accumulate citations — read them as a signal of influence on later filers, not as a current importance ranking. Two of the five most-cited records share the same title and assignee family, filed as separate US applications.

Patent titles are shown in the language they were filed in, not translated, so that each record stays verifiable against the original filing — a translated title will not match in Eureka or in any national register. Publication numbers are shown where the record carries one (6 of 6 rows); clicking a row searches Eureka by that number.

Source: Patsnap Eureka. Citation counts and representative records. Derived from a Patsnap search on Virtual Power Plant EV Charging Infrastructure covering 2015–2026, data cut-off 2026-07-31. Counts reflect published records only and shift as new filings publish.Run this in Eureka MCP
Run it yourself

Put your own technology through the same analysis

 
Where to run it
Fastest

Eureka on the web

When you want the answer in the next five minutes.

The agent works the prompt against patents and technical literature, citing every source.

Run your analysis now →
For builders

MCP server & REST API

When it has to run inside your own pipeline.

Patent search, landscape analysis and assignee resolution as MCP tools. Drop them into any agent framework, or call REST directly.

Browse MCP servers →
Insights

What the numbers imply for filing strategy

Reading the trend, the IPC split and the citation table together points to a field that is still being defined rather than consolidated.

Filing volume
10 families
total identified

A dataset this small rewards precise claims

With only ten families across the full window, no single assignee has built a defensive thicket. A well-drafted claim on a specific control method — rather than a broad VPP-plus-charging concept — has real room to stand out and to be enforced without immediately colliding with prior art.

Peak year 2024 = 4 filings
Geography
China 5 · US 2
receiving offices

Filing geography is lopsided, not global

Five of the identified receiving offices are Chinese, with the US, EPO, HK and WIPO each holding one or two. Anyone filing for enforcement in Europe or against EPO designations is working against a much thinner prior-art base than someone filing in China.

9 receiving offices identified across the corpus
Classification overlap
H02J in 10/10
records

Grid control is the anchor class, EV propulsion is optional

Every record sits in H02J; only half also carry a B60L code. That split suggests the inventive core in most filings is the grid-facing aggregation or dispatch logic, with the EV charging interface treated as one application among others rather than the primary claim subject.

B60L present in 5/10 · G06Q in 3/10 · G05B in 2/10
Collaboration
1 pair
co-assignee link

Almost no joint filing activity

Only one co-assignee pair appears in the entire dataset, and it is a single occurrence. That points to a field of independent filers rather than consortia or joint-venture R&D, which in turn means licensing and cross-filing negotiation history is thin to work with.

Strongest pair: 1 shared filing
Eureka AI Agent
Looking for what nobody has claimed yet?

Eureka can read the same corpus for gaps instead of for coverage: under-claimed branches adjacent to virtual power plant ev charging infrastructure, with the prior art for and against each one.

Find the white space →
Co-filing is essentially absent
AssigneeCo-assigneeShared families
Shenyang Northern Huamao Construction Technology Engineering Co., Ltd.Huamao (Liaoning Shenfu New District) Construction Technology Co., Ltd.1

The one identified co-assignee pair — a construction-technology parent and its regional affiliate — filed together once. There is no visible pattern of joint ventures or supplier-OEM co-filing in this corpus yet.

Source: Patsnap Eureka. Co-assignee relationships and derived observations. Derived from a Patsnap search on Virtual Power Plant EV Charging Infrastructure covering 2015–2026, data cut-off 2026-07-31. Counts reflect published records only and shift as new filings publish.Run this in Eureka MCP
Players

Who is filing, and where the field is still open

Recent-year momentum across the named assignees is uniformly flat: every tracked entity shows zero filings in the latest year, and one shows a full -100% year-on-year drop. That is consistent with a data-lag effect as much as a real slowdown, but it also means no assignee here has yet demonstrated sustained, compounding filing activity.

Momentum
0 latest year
across all tracked assignees

No assignee is currently accelerating

Every named filer in the momentum table — from robotics and consultancy firms to a telecom operator — shows zero filings in the most recent year. Given the publication lag, this likely understates 2025-2026 activity rather than confirming a genuine pullback, but it means rankings here are not yet stable.

Hubei Hanwei Electric Power Consulting Co., Ltd.: -100% YoY
Concentration
10 families, 1 co-filing pair
ownership spread

Ownership is fragmented, not consolidated

With ten families spread across a mix of Chinese construction-technology firms, a Finnish telecom operator, and other independent filers, no assignee has built a portfolio dense enough to dominate freedom-to-operate analysis. That fragmentation is itself the finding: this is a market position still up for the taking.

Strongest co-assignee link: 1 shared filing
Non-Chinese entrants
ELISA OYJ
WIPO/PCT filer

A telecom operator, not a utility, filed the PCT route

The only WIPO/PCT record in the dataset comes from ELISA OYJ, a telecom operator rather than a traditional grid or automotive player. That signals VPP-EV charging control is attracting filers from outside the expected utility and OEM set.

WO2024227976A1, published 2024-11-07
🔍
Under-claimed sub-areas worth watching
Combinations that show up rarely, or not at all, in the current ten-family set — each is a candidate for a first-mover claim rather than a crowded one.
bidirectional V2G tariff settlement logicmulti-asset reserve-group scheduling for frequency responseEV fleet-level aggregation with G06Q billing integrationclosed-loop G05B control for distributed charger clusterscross-border PCT filings on VPP dispatch methods
Rank all filers by momentum →
Recent-year filing momentum by assignee
AssigneeRecent yearYoY
Shanghai Cancong Robot Technology Co., Ltd.0
Newway Co., Ltd.0
ELISA OYJ0
Hubei Hanwei Electric Power Consulting Co., Ltd.0-100%
Shenyang Northern Huamao Construction Technology Engineering Co., Ltd.0
Huamao (Liaoning Shenfu New District) Construction Technology Co., Ltd.0
Shanghai Shenghao Equipment Installation Co., Ltd.0
Source: Patsnap Eureka. Assignee-level momentum. Derived from a Patsnap search on Virtual Power Plant EV Charging Infrastructure covering 2015–2026, data cut-off 2026-07-31. Counts reflect published records only and shift as new filings publish.Run this in Eureka MCP
What's next

Where to take this analysis

The structural picture is clear; the next step is testing specific claim language against this small but active corpus.

Map claims against the H02J/B60L split

Before drafting, check whether a proposed claim reads as pure grid-control (H02J only) or genuinely bridges into EV propulsion (B60L). The dataset shows the latter is the less-crowded half.

Explore IPC breakdowns in Eureka

Watch the 2024-2026 filings as they publish

With 2024 as the current peak and an 18-month publication lag, filings from 2025 onward are still arriving. Re-check the trend line in a future cut before finalising freedom-to-operate conclusions.

Track filing trends in Eureka

Test the under-claimed combinations

The gate chips above point to specific IPC and functional combinations that are thin in this corpus. Running a targeted prior-art search on each before drafting can confirm whether they are genuinely open.

Run a white-space search in Eureka
Source: Patsnap Eureka. Forward-looking reading of the same dataset. Derived from a Patsnap search on Virtual Power Plant EV Charging Infrastructure covering 2015–2026, data cut-off 2026-07-31. Counts reflect published records only and shift as new filings publish.Run this in Eureka MCP
FAQ

Common questions on this landscape

Answers are grounded in the same dataset. Derived from a Patsnap search on Virtual Power Plant EV Charging Infrastructure covering 2015–2026, data cut-off 2026-07-31. Counts reflect published records only and shift as new filings publish.Run this in Eureka MCP

Research Virtual Power Plant EV Charging Infrastructure in depth with Eureka

Go past this page: query the whole virtual power plant ev charging infrastructure corpus yourself, in your own scope.
Every answer comes back with patent numbers you can open.

Try Eureka

Disclaimer. This page is generated from Patsnap Eureka data drawn from a limited snapshot of global patent and scientific-literature records, and is provided for general information and reference only.

Patent data carries inherent limitations: recent filings (typically the most recent 18–24 months) are under-counted due to standard publication lag; counts may be reported at either a patent-family or a patent-record basis and are not always directly comparable; classification, applicant-name, and citation data may contain errors, duplicates, or omissions; and the underlying search query defines and constrains the scope shown. As a result, the analysis may be incomplete or inaccurate and may not reflect the full technology landscape.

Nothing on this page constitutes an exhaustive prior-art, novelty, freedom-to-operate, or validity search, nor does it constitute legal, financial, investment, or professional advice, and it should not be relied upon as such. Any patent, commercial, or strategic decision should be verified independently and reviewed with qualified patent, legal, and domain professionals. Patsnap makes no warranties, express or implied, as to the accuracy, completeness, or fitness for any particular purpose of the information presented.

Machine translation. Assignee and organisation names originally recorded in Chinese, Japanese or Korean have been rendered into English by an AI translation step so that the tables stay readable. These renderings are best-effort and may not match a company’s registered English name; the original name is what the underlying patent record carries, and it is what any Eureka query launched from this page uses.

Help us improve this page

Found incorrect or outdated information? Let us know and we'll get it fixed.